Demo siteBack to SlateMark

Roofing · Denver & the Front Range · Since 1999

One crew.
Your roof.
Start to finish.

The Ridgeline crew that measures your roof is the crew that tears it off, nails it on and sweeps the yard when the light goes. No sales reps. No subcontractors. Nobody you haven’t met.

Since 1999Denver, Colorado
Our own crewsNo subcontractors, ever
Certified installerManufacturer-backed warranty demo
Licensed & insuredDenver contractor licence on request demo

Demo crew photography — replace at swap

01 · The crew

Who’s actually on your roof.

At most roofing companies, three different people touch your job — and none of them have met each other.

The usual way
  1. A salesperson on commission measures your roof from the driveway.
  2. A subcontracted crew, hired that week and paid by the square, does the install.
  3. A different phone number answers when something leaks in year four.
Ridgeline
  1. Danny walks your roof and writes the estimate.
  2. Danny’s crew tears it off and nails it on — the same people, every job.
  3. Danny answers in year nine. Same number as year one.

Subcontracting isn’t a crime. It’s just the reason nobody at the company knows what’s under your shingles. We do it the slow way because we’re the ones who have to come back. Meet the crew →

Two Ridgeline crew members at the truck on measure day — one cutting ridge vent at the sawhorse, one carrying a ladder to the house
Measure day. Demo photography
A roofer’s hands running a tape measure along a box of ridge vent
  • Danny Ortega running a circular saw at the sawhorse
    Danny OrtegaOwner and foreman. On roofs since 1999; started Ridgeline the season after. Writes every estimate himself.Demo persona
  • Wes Halvorsen in the driveway, checking his harness before going up
    Wes HalvorsenCrew lead. Runs ropes, tear-off and the deck walk. With us since 2012.Demo persona
  • The rest of the crewYou’ll meet them by name on measure day, and the same faces will be there for the walk-through. Who they are →
02 · Hail & insurance

When it hails, your claim comes down to a chalk square.

A field of new architectural shingles with a ten-by-ten hail test square chalked on it and eight hits circled
A ten-by-ten test square, chalked on the north slope. Demo photography

Your adjuster will chalk a ten-foot square on each slope and count the hail hits inside it. Above a threshold, the carrier replaces the slope. Below it, they don’t. That square decides whether you get a new roof or a letter.

So we chalk it first — every slope, photographed, counted and dated before the adjuster arrives — and then we stand on the roof with them and walk the squares together. How a hail claim actually works →

  1. 01

    Your deductible is yours.

    Colorado’s residential roofing law (SB 12-038) makes it illegal for a roofer to pay, waive or rebate your insurance deductible. If someone at your door offers to, that tells you what you need to know about them.

  2. 02

    If the claim is denied, you can walk.

    The same law gives you 72 hours after a denial to cancel a roofing contract and get your deposit back. It’s in our contract in plain language, on page one.

  3. 03

    Two checks, not one.

    Most policies pay the depreciated value first and release the rest when the work is done. We show you both numbers before you sign, and we invoice the carrier for the second check so you’re not chasing it.

  4. 04

    We don’t knock after a storm.

    If it hailed last night, we’re on our own customers’ roofs today, not on your porch. Call when you’re ready. The square will still be there.

03 · The install day

One day, start to finish.

What actually happens on a Ridgeline install day — the short version. The whole day, hour by hour →

  1. Crew arrives.

    Tarps over the beds, plywood over the AC unit, magnets out of the truck. You’ll meet everyone by name before anyone goes up.

  2. The deck walk.

    Every sheet walked. Soft or rotten decking is cut out, replaced and photographed — you get the photos before it’s covered, not a line item after.

  3. Shingles, six nails each.

    Four is the manufacturer’s minimum. Six is what the Front Range wind actually asks for. Ridge vent goes on last.

  4. Walk-through with you.

    The magnet sweep is done, twice. Photos of the deck, the flashing and the finished roof, and the warranty registered in your name before the truck pulls out.

The crew rolling out synthetic underlayment over a freshly stripped deck
9:15 — underlayment going down over a bare deck. Demo photography
Aerial view of a suburban block with three roofs marked in chalk
Demo aerial — the annotations are illustrative until swapped for the client’s own jobs.
05 · Our work

We’ve probably done a roof on your street.

Ask us for three addresses near you. We’ll give you roofs from different years, so you can drive past and see how they’ve held up — not how they looked on day one.

Roofs you can drive past

Where we work

  • Denver
  • Aurora
  • Lakewood
  • Arvada
  • Wheat Ridge
  • Westminster
  • Thornton
  • Broomfield
  • Centennial
  • Littleton
  • Highlands Ranch
  • Parker
  • Golden
  • Englewood

All service areas →

06 · From homeowners

Word for word.

Demo reviews — replace with the client’s own, verbatim

The guy who quoted it was on the roof with the crew at seven the next Tuesday. I’ve never had that happen with a contractor.

Renee A. · Park Hill · replacement

They chalked the whole roof before the adjuster came, then walked him through it. The claim went through the first time.

Tom & Priya K. · Aurora · hail claim

Told me the leak was a pipe boot and not a new roof. Charged me for a pipe boot.

Marcus D. · Lakewood · repair

More, word for word →

07 · Warranty

A roof warranty is two documents.

The manufacturer covers the shingle. The installer covers the install. Most leaks are install problems, so it’s the second document that matters — and it’s only as good as the company still answering the phone.

Material
The manufacturer’s limited lifetime warranty on the shingle, registered in your name before the truck leaves.
Workmanship
Ridgeline’s own — ten years, in writing demo term — from the same people who installed it.
Backed past us
As a certified installer, the manufacturer stands behind our workmanship warranty even if we were ever to close. What that means in year nine →
A roofer’s hands holding a fistful of roofing nails
Six nails a shingle. Demo photography

Talk to Danny.

Call, or send the form and Marisol will call you back to set a time. If it’s raining into the house right now, call — the tarp comes first and the paperwork after.

Call (720) 555-0139 Get an estimate